SEMICONDUCTOR D&F PLANT

CMSA-FACI-HVAC-0115.jpg

SCOPE OF WORK

The client of this state-of-the-art semiconductor plant project developed the basis of the design, RFQ and qualification of the bidders. Our job was CPM for the GC Consortium. The management approach included final design coordination, tender packages prep., procurement management, cost review, scope management, schedule review, quality planning, construction management with four clean construction protocol phases, project control and commissioning coordination. Three years of facilities management. CPM of 100 tools hook up phase.

CMSA-INTE-SL__-0105.jpg

PROJECT CHARACTERISTICS

A semiconductor campus with a fabrication building with subfab and walkable plenum space and a design center building.  Anti-vibration foundations, waffle table and high thermal insulation standards. 23.000 sq-ft of expandable ISO Class 7 and 5 upgradable cleanrooms, with raised floor. Two 760 cu-m steel storage tanks for industrial water and for FM fire protection system. Two 13.8kV redundant electrical feeders, 10 MVA of electrical power installed, 2MW of emergency generators and 0,5MW of UPS.  A 38 cu-m/h WWT plant for acids and solvents. An 37 cu-m/h state-of-the-art UPW plant. 2.000 TR's of chilled water system with centrifugal and screw chillers. LPG boilers, pumps and distribution. Air distribution with ultra-filtered Makeups, air handling units and FFU on the cleanroom ceilings. Scada system. Scrubbers for acid and solvent exhausting fumes. PCW, CDA, PVa, HCVa for industrial process systems. Bulk gases and distribution piping for high purity gases as HPN2, HPH2, HPO2, HPAr e HPHe. Specialty gases cabinets, piping distribution and safety systems for industrial processes.  Hook up phase: move in and 100 industrial tools hook up.

TRANSMISSION & DISTRIBUTION PLANT EXPANSION

AREVA SA, TRANSMISSION AND DISTRIBUTION

SCOPE OF WORK

A design-build contract for a new huge transformers product line of this transmission and distribution plant. The client developed the preliminary list of needs, RFQ and qualification of the bidders. The contract approach included all design & engineering for the plant expansion including works of CIVIL, special FF/FL for industrial floor, MEP, Vapour and CA expansion.

Areva Plant.jpg

MILITARY AND AVIONIC PLANT

CMSA-CTLG-AELS-0013.jpg

SCOPE OF WORK

A design-build contract for this advanced Military-Defense electronic systems and avionic manufacturer. The Client developed the basis of design, RFQ and qualification of the bidders. The contract approach included final design & engineering, works for site preparation, civil, cleanroom, MEP, FPS, HVAC, standard process systems, anti-vibration equipment bases  and commissioning of all disciplines.

PULP, PAPER AND PACKAGING PLANT

SANOVO GREENPACK

SCOPE OF WORK

A design-build contract for this state-of-the-art paper packaging plant. The Client developed the preliminary list of needs, RFQ and qualification of the bidders. The contract approach included all design & engineering for the plant, works for site preparation, civil, MEP, FPS, HVAC, wastewater treatment plant, water storage tank,  equipment bases, cargo scales and commissioning.

CMSA-CTLG-SNVG-0014.jpg
CMSA-CTLG-PTNV-0016.jpg

NAVEGANTES CONTAINER TERMINAL

PORTONAVE

SCOPE OF WORK

Design-Build all port buildings and water utilities. This state-of-the-art container port terminal of MSC Shipping Company was built in the South of Brazil. Our mission was to design-build 6 buildings in 11 months, including CIVIL, MEP, FPS, HVAC and water utility.

TECH-PARK P97 BDG

TECNOPUC RS

SCOPE OF WORK

Re-DESIGN civil to the pos tensioned flat slabs, façades in architectural precast concrete and general construction. The client prepared the basis of design, RFQ and selection of the bidders. Our scope included included CPM and general construction of the CIVIL, MEP, FPS and HVAC and commissioning.

CMSA-CTLG-P097-0020.jpg
CMSA-CTLG-HLAR-0041.jpg

ESPLÊNDIDO CONDOMINIUM

H.LAR (GRUPO HERVAL)

SCOPE OF WORK

Design, Fabrication and Build, superstructure and façades.  The structure was designed in post tensioning flat slabs and the façades in architectural precast concrete panels.  The type of contract was fixed price and CPM of the building shell of the condominium. 

LIBERDADE CONDOMINUM

OAS EMPREENDIMENTOS

SCOPE OF WORK

Design, Fabrication and Build, superstructure and façades.  The structure was designed in post tensioning flat slabs and the façades in architectural precast concrete panels.  The type of contract was fixed price and CPM of the building shell of the condominium. 

CMSA-CTLG-OAS1-0037.jpg
CMSA-CTLG-CFL_-0035.jpg

MIXED-USE PROJECT

CFL

SCOPE OF WORK

Design, Fabrication and Build, superstructure and façades.  The structure was designed in post tensioning flat slabs and the façades in architectural precast concrete panels.  The type of contract was fixed price and CPM of the building shell of this state-of-the-art mixed-use project. 

NUOVA VITA CONDOMINIUM

PDG

SCOPE OF WORK

The client was responsible for the design, RFQ and bidders selection. We did the value engineering for superstructure with postensioning flat slabs and other minor changes.  We were award contract for CPM of all construction trades for this big real estate residential project. 